job timeout inconsistency

0

We have the attemptDurationSeconds set to 2 days, but the termination we got was 1 job at 2 days, 1 job at 6 days, 2 at 7 days. No other jobs were running during those 2~6 day period.

I know the doc says it's on a best-effort basis and not to expect accurate timing, but this is wild. Is there any way to determine whether this is just a hiccup? Should my effort goto writing something that sweeps and checks for job with duration longer than 2 days?

質問済み 1年前74ビュー
回答なし

ログインしていません。 ログイン 回答を投稿する。

優れた回答とは、質問に明確に答え、建設的なフィードバックを提供し、質問者の専門分野におけるスキルの向上を促すものです。

質問に答えるためのガイドライン

関連するコンテンツ