Quicksight - Using calculated field in visualizations

0

Hi, I have a very simple calculated field which is a ratio of 2 summed metrics, which I want to use in several visualizations. Other than the Table and Pivot visuals, every time I try to use the calculated field as a value (say in a horizontal bar chart) with one of the dimensions, I keep getting "Table calculation attribute reference(s) are missing in field wells". I am assuming I can't be expected to include the 2 metrics that are used in the calculated metric into the visual, correct? It is such a basic thing that I can't imagine there is no option to utilize a calculated metric in a simple bar chart. Any idea what I could be doing wrong?

질문됨 2년 전169회 조회
답변 없음

로그인하지 않았습니다. 로그인해야 답변을 게시할 수 있습니다.

좋은 답변은 질문에 명확하게 답하고 건설적인 피드백을 제공하며 질문자의 전문적인 성장을 장려합니다.

질문 답변하기에 대한 가이드라인

관련 콘텐츠