1 個回答
- 最新
- 最多得票
- 最多評論
0
you can always add a new table in selection for cdc task but linking of expdp/impdb with scn would be an issue with existing task. I would suggest create a new cdc only task for the new table with start scn from the expdp/impdb
if we had original full load and cdc task then it would have been easy to stop the running task, add new table, resume task which will do full load and cdc.
已回答 2 年前
相關內容
- 已提問 10 個月前
- AWS 官方已更新 6 個月前
- AWS 官方已更新 2 年前