1 回答
- 最新
- 投票最多
- 评论最多
1
The length of time before a manual approval action times out is set to 7 days and is not configurable. This is documented in the Quotas in AWS CodePipeline. The specific value is listed under the quotas that are fixed and cannot be changed.
已回答 10 个月前